Non-binding initial consultation!   

We help you with the right steam boiler plant. Turn-key. Efficient. Inexpensive.

Request Recall

Our Products

We will help you determine the right steam system with suitable steam generator.

We are happy to focus on what offers you the greatest value when designing your steam boiler system:

consumption efficiency, high heat recovery or particularly low cost.

Shell boiler


This type of plant is predestined for 24/7 operation.                                                        

Features

  • Robust operation with higher fault tolerance
  • Better cushions small unforeseen steam fluctuations
  • Possible more efficient energy use of water by avoiding a water separator
  • High efficiency with uniform continuous operation
  • Large steam quantities per boiler possible

Electric steam generator​


This type of system can be quickly and modularly adapted to fluctuating vapour quantities.                

Features

  • Simple scaling up and down of the required steam quantity by parallel connection of several quick steam generators
  • Less expensive redundancy guarantee due to parallel connection
  • More efficient operation with large fluctuations in daily steam consumption
  • Quick switch-on/switch-off when steam is not required throughout the day  

Electric steam generator​


This type of plant requires fewer accessories and can be used in a modular way.                                 

Features

  • Omission of exhaust systems and combustion devices
  • Requires suitable power infrastructure for power supply
  • Quick on/off when steam is not needed all day long
  • Subsidy benefits due to reduction of fossil fuels ​
  • Very quick steam draw possible

Electric-gas parallel operation


This type of plant is more independent of the energy source and can be combined with solar power. 

Features

  • Parallel connection of high-speed steam generator(s) and electric steam generator to adapt to fluctuations in raw material costs
  • Can use solar power excess capacity in summer and gas in winter
  • Quick on/off when steam is not needed all day long
  • Subsidy benefits due to reduction of fossil fuels


We will be glad to help you find the most suitable solution for your steam supply

Steam plant - Optional products

Depending on the consumer types, further products can/must be integrated into the system.

                  

Feedwater vessel

The feedwater vessel is used for the preparation, degassing and intermediate storage of the boiler water. Based on the required steam quantity and the type of steam plant, the feedwater vessel is designed and equipped with the appropriate fittings.

Feed water pump group

Redundant pump group for conveying the hot feed water to the steam generator.

Mixing cooler / Desludging cooler

Mixing cooler or also pinch-off cooler as collecting tank and cooling station for waste water leaving the steam circuit. Completely welded, pinch-pickled and pressure tested if necessary.

 

 

              

Condensate collecting vessel

Collection tank for the returning condensate. With lifting station/pump group for return to the feed water vessel.


Test water sampling station

Station for taking treated water, boiler water, feed water, etc. for prescribed water value monitoring.

Economiser/exhaust gas heat exchanger

Heat exchanger to preheat the feed water and further cool down the flue gases.

      

Piping construction steam boiler house

Complete piping of steam and condensate lines within the steam plant products to the steam representative. Additional piping such as gas/oil line (supply line), blow-off lines, fresh water lines are also carried out.

 ​  

Pipeline construction Periphery

Piping of the steam and condensate lines from the steam distributor to the various steam consumers. Steam-compliant piping in various materials (1.44/1.43, black steel) for connection and medium exchange in the steam piping network.

Pure steam generator/steam converter station

Stations for forming different media such as steam/steam or water/steam.